Search CheapestInIndia.com

Evm enstore 8gb metal usb 2.0 flash drive - high read speeds up to 15mb/s & write speeds up to 8mb/s - durable metal casing - ideal for data transfer & storage - (evmpd/8gb)

amazon.in small logoAmazon.in
EVM EnStore 8GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/8GB) image 1EVM EnStore 8GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/8GB) image 2EVM EnStore 8GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/8GB) image 3EVM EnStore 8GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/8GB) image 4EVM EnStore 8GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/8GB) image 5
₹299
*

Amazon Price History - Evm en store 8 gb metal usb 2 0
From: 17 May 2025 to 25 Nov 2025

amazon.in EVM EnStore 8GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/8GB) Price History Graph from 17 May 2025 to 25 Nov 2025

Price History amazon.in EVM EnStore 8GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/8GB)

NoDatePriceChange
125 Nov 20252990
216 Nov 2025299
+70
322 Oct 2025229 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
1527
Amazon Rating
4.1/5
Lowest Price Detected₹ 195
Lowest Price Date22 sep 2025
Best Price Was About2 months ago
Price History Available Since17 May 2025

EVM EnStore 8GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/8GB)
Price In India Details And Price History Trend From: 17 May 2025 to 25 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : moderate

The current price is ₹299, which is ₹104 (53.3%) higher than the best price of ₹195 last seen on 22 Sep 2025. Over the 192 day price history period, prices have ranged from ₹195 to ₹299, with an average of ₹243. The pricing shows high volatility with significant fluctuations, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 4 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has moderate confidence due to price volatility, so continue monitoring trends. The next estimated price target is ₹309, trending higher, making this likely the current best offer.

Similar products from Amazon.in

Transcend CF2PC USB Type A Compact Flash Adaptor-picture-10
₹1135
amazon.in small logo
Amazon.in
Price Rise+6
Price Up 1 week ago

Transcend CF2PC USB Type A Compact Flash Adaptor

Check Price History
SanDisk Cruzer Blade SDCZ50-008G-I35 8GB USB 2.0 Pen Drive-picture-12
₹399
amazon.in small logo
Amazon.in
Price Rise+10
Price Up 1 day ago

SanDisk Cruzer Blade SDCZ50-008G-I35 8GB USB 2.0 Pen Drive

Check Price History
HP USB 2.0 Flash Drive 128GB (v236w)-picture-22
₹869
amazon.in small logo
Amazon.in
Price Drop-60
Price Down 4 days ago

HP USB 2.0 Flash Drive 128GB (v236w)

Check Price History
HP USB 2.0 Flash Drive 128GB v150w-Blue-picture-23
₹789
amazon.in small logo
Amazon.in
Price Drop-60
Price Down 5 days ago

HP USB 2.0 Flash Drive 128GB v150w-Blue

Check Price History
HP 712w 64GB USB 3.2 Flash Drive- Blue-picture-26
₹539
amazon.in small logo
Amazon.in
Price Rise+11
Price Up 1 week ago

HP 712w 64GB USB 3.2 Flash Drive- Blue

Check Price History