Search CheapestInIndia.com

Evm enstore 64gb metal usb 2.0 flash drive - high read speeds up to 15mb/s & write speeds up to 8mb/s - durable metal casing - ideal for data transfer & storage - (evmpd/64gb)

amazon.in small logoAmazon.in
EVM EnStore 64GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/64GB) image 1EVM EnStore 64GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/64GB) image 2EVM EnStore 64GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/64GB) image 3EVM EnStore 64GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/64GB) image 4EVM EnStore 64GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/64GB) image 5
₹449
*

Amazon Price History - Evm en store 64 gb metal usb 2 0
From: 9 May 2025 to 20 Nov 2025

amazon.in EVM EnStore 64GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/64GB) Price History Graph from 9 May 2025 to 20 Nov 2025

Price History amazon.in EVM EnStore 64GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/64GB)

NoDatePriceChange
120 Nov 2025449
+20
27 Nov 2025429
+80
38 Oct 2025349
+40
422 Sep 2025309
-10
511 Sep 2025319 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
1528
Amazon Rating
4.1/5
Lowest Price Detected₹ 309
Lowest Price Date22 sep 2025
Best Price Was About2 months ago
Price History Available Since9 May 2025

EVM EnStore 64GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/64GB)
Price In India Details And Price History Trend From: 9 May 2025 to 20 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : high

The current price is ₹449, which is ₹140 (45.3%) higher than the best price of ₹309 last seen on 22 Sep 2025. Over the 195 day price history period, prices have ranged from ₹309 to ₹449, with an average of ₹375. The pricing shows moderate volatility, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 1 this month, and 16 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹463, trending higher, making this likely the current best offer.

Similar products from Amazon.in

HP v236w USB 2.0 64GB Pen Drive,-picture-10
₹529
amazon.in small logo
Amazon.in
Price Drop-40
Price Down 7 hours ago

HP v236w USB 2.0 64GB Pen Drive,

Check Price History
HP x796w 64GB USB 3.2 Flash Drive-picture-11
₹749
amazon.in small logo
Amazon.in
Price Rise+50
Price Up 2 weeks ago

HP x796w 64GB USB 3.2 Flash Drive

Check Price History
HP v236w 16GB USB 2.0 Pen Drive, Multi-picture-12
₹369
amazon.in small logo
Amazon.in
Price Rise+20
Price Up 1 month ago

HP v236w 16GB USB 2.0 Pen Drive, Multi

Check Price History
SanDisk Cruzer Blade SDCZ50-008G-I35 8GB USB 2.0 Pen Drive-picture-14
₹389
amazon.in small logo
Amazon.in
Price Rise+20
Price Up 2 days ago

SanDisk Cruzer Blade SDCZ50-008G-I35 8GB USB 2.0 Pen Drive

Check Price History
HP USB 2.0 Flash Drive 128GB v150w-Blue-picture-19
₹789
amazon.in small logo
Amazon.in
Price Drop-60
Price Down 7 hours ago

HP USB 2.0 Flash Drive 128GB v150w-Blue

Check Price History
HP 712w 64GB USB 3.2 Flash Drive- Blue-picture-21
₹539
amazon.in small logo
Amazon.in
Price Rise+11
Price Up 2 days ago

HP 712w 64GB USB 3.2 Flash Drive- Blue

Check Price History
HP v222w 64GB USB 2.0 Pen Drive (Silver)-picture-22
₹479
amazon.in small logo
Amazon.in
Price Drop-30
Price Down 7 hours ago

HP v222w 64GB USB 2.0 Pen Drive (Silver)

Check Price History
Digitek (Dud 128GB 2.0) Pen Drive USB V2.O U Disk 128GB-picture-26
₹639
amazon.in small logo
Amazon.in
Price Drop-20
Price Down 4 days ago

Digitek (Dud 128GB 2.0) Pen Drive USB V2.O U Disk 128GB

Check Price History