Search CheapestInIndia.com

Wearfit champ switch 2 color straps kids smart watch, with 2 color straps 4g long-lasting video & phone call, kids gps watch with real-time location tracking, 7 games & ip67 water-resistance (purple)

firstcry.com small logoFirstcry.comBrand : wearfit
WEARFIT Champ Switch 2 color Straps Kids Smart Watch, with 2 Color Straps 4G Long-Lasting Video & Phone Call, Kids GPS Watch with Real-time Location Tracking, 7 Games & IP67 Water-Resistance (Purple) image 1WEARFIT Champ Switch 2 color Straps Kids Smart Watch, with 2 Color Straps 4G Long-Lasting Video & Phone Call, Kids GPS Watch with Real-time Location Tracking, 7 Games & IP67 Water-Resistance (Purple) image 2WEARFIT Champ Switch 2 color Straps Kids Smart Watch, with 2 Color Straps 4G Long-Lasting Video & Phone Call, Kids GPS Watch with Real-time Location Tracking, 7 Games & IP67 Water-Resistance (Purple) image 3WEARFIT Champ Switch 2 color Straps Kids Smart Watch, with 2 Color Straps 4G Long-Lasting Video & Phone Call, Kids GPS Watch with Real-time Location Tracking, 7 Games & IP67 Water-Resistance (Purple) image 4WEARFIT Champ Switch 2 color Straps Kids Smart Watch, with 2 Color Straps 4G Long-Lasting Video & Phone Call, Kids GPS Watch with Real-time Location Tracking, 7 Games & IP67 Water-Resistance (Purple) image 5
₹6373
*

Firstcry Price History - Wearfit champ switch 2 color straps
From: 25 Oct 2024 to 27 Nov 2025

firstcry.com WEARFIT Champ Switch 2 color Straps Kids Smart Watch, with 2 Color Straps 4G Long-Lasting Video & Phone Call, Kids GPS Watch with Real-time Location Tracking, 7 Games & IP67 Water-Resistance (Purple) wearfit Price History Graph from 25 Oct 2024 to 27 Nov 2025

Price History firstcry.com WEARFIT Champ Switch 2 color Straps Kids Smart Watch, with 2 Color Straps 4G Long-Lasting Video & Phone Call, Kids GPS Watch with Real-time Location Tracking, 7 Games & IP67 Water-Resistance (Purple)

NoDatePriceChange
127 Nov 202563730
225 Sep 20256373
+102
310 Sep 20256271 

Product Info

FeatureValue
StoreFirstcry.com
Brand
Lowest Price Detected₹ 5778
Lowest Price Date21 jul 2025
Best Price Was About4 months ago
Price History Available Since25 Oct 2024

WEARFIT Champ Switch 2 color Straps Kids Smart Watch, with 2 Color Straps 4G Long-Lasting Video & Phone Call, Kids GPS Watch with Real-time Location Tracking, 7 Games & IP67 Water-Resistance (Purple)
Price In India Details And Price History Trend From: 25 Oct 2024 to 27 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : high

The current price is ₹6,373, which is ₹595 (10.3%) higher than the best price of ₹5,778 last seen on 21 Jul 2025. Over the 398 day price history period, prices have ranged from ₹5,778 to ₹6,628, with an average of ₹6,456. The pricing has been quite stable with low volatility, with prices remaining relatively stable overall. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 3 over the past year. The price direction is uncertain, so monitor the situation for a few more days before making a decision.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹6,288, trending lower, making this potentially a good time to wait for an even better deal.

Similar products from Firstcry.com

SanDisk Flash Drive 32GB USB Cruzer Blade (Red Black)-picture-14
₹469
firstcry.com small logo
Firstcry.com
Price Rise+68
Price Up 2 weeks ago

SanDisk Flash Drive 32GB USB Cruzer Blade (Red Black)

Check Price History
Samsung 15W PD Type  C To C With 1 Meter Cable Power Adapter(Black)-picture-15
₹1239
firstcry.com small logo
Firstcry.com
Price Rise+100
Price Up 3 months ago

Samsung 15W PD Type C To C With 1 Meter Cable Power Adapter(Black)

Check Price History
Samsung 25W TYPE-C Power Adapter (White)-picture-25
₹1139
firstcry.com small logo
Firstcry.com
Price Rise+91
Price Up 3 months ago

Samsung 25W TYPE-C Power Adapter (White)

Check Price History
azhari Kids Digital Camera Toys for Toddlers Kids Girls Boys-picture-26
₹1839
firstcry.com small logo
Firstcry.com
Price Rise+145
Price Up 3 months ago

azhari Kids Digital Camera Toys for Toddlers Kids Girls Boys

Check Price History
SanDisk  Pen Drive 16 GB USB 2.0  Cruzer Blade (Red Black) SDCZ50-picture-28
₹429
firstcry.com small logo
Firstcry.com
Price Rise+59
Price Up 2 weeks ago

SanDisk Pen Drive 16 GB USB 2.0 Cruzer Blade (Red Black) SDCZ50

Check Price History