Search CheapestInIndia.com

Nsaw wbs-6 8l single wall rectangular water bath, nsaw-1235

moglix.com small logoMoglix.comBrand : nsaw
NSAW WBS-6 8L Single Wall Rectangular Water Bath, NSAW-1235 image 1
₹6960
*

Moglix Price History - Nsaw wbs 6 8 l single wall rectangular
From: 28 Oct 2024 to 1 Dec 2025

moglix.com NSAW WBS-6 8L Single Wall Rectangular Water Bath, NSAW-1235 nsaw Price History Graph from 28 Oct 2024 to 1 Dec 2025

Price History moglix.com NSAW WBS-6 8L Single Wall Rectangular Water Bath, NSAW-1235

NoDatePriceChange
11 Dec 202569600
29 Nov 20256960
+1
328 Oct 20256959
-1
421 Oct 20256960
+1
521 Oct 20256959
-1
617 Oct 20256960
+1
717 Oct 20256959
-1
817 Oct 20256960
+1
917 Oct 20256959
-1
1015 Oct 20256960 

Product Info

FeatureValue
StoreMoglix.com
Brand
Lowest Price Detected₹ 6958
Lowest Price Date28 aug 2025
Best Price Was About3 months ago
Price History Available Since28 Oct 2024

NSAW WBS-6 8L Single Wall Rectangular Water Bath, NSAW-1235
Price In India Details And Price History Trend From: 28 Oct 2024 to 1 Dec 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : high

The current price is ₹6,960, which is ₹2 (0.0%) higher than the best price of ₹6,958 last seen on 15 Jul 2025. Over the 399 day price history period, prices have ranged from ₹6,958 to ₹6,963, with an average of ₹6,960. The pricing has been quite stable with low volatility, with prices remaining relatively stable overall. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 162 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹6,960, trending lower, making this potentially a good time to wait for an even better deal.

Related products

Similar products from Moglix.com

Weswox STM-64 Binocular Stereoscopic Microscope-picture-10
₹9735
moglix.com small logo
Moglix.com
Price Rise+2
Price Up 2 weeks ago

Weswox STM-64 Binocular Stereoscopic Microscope

Check Price History
Lab Plus Vacuum Pump 1/4 inch Suction, LP-5818 (Pack of 5)-picture-12
₹4427077
moglix.com small logo
Moglix.com
Price Drop-3
Price Down 1 month ago

Lab Plus Vacuum Pump 1/4 inch Suction, LP-5818 (Pack of 5)

Check Price History
Lab Plus Probio Base Mold, LP-12877 (Pack of 1000)-picture-13
₹41240
moglix.com small logo
Moglix.com
Price Rise+1
Price Up 4 hours ago

Lab Plus Probio Base Mold, LP-12877 (Pack of 1000)

Check Price History
Lab Plus Personal Centrifuge 143x166x184, LP-8987-picture-14
₹133463
moglix.com small logo
Moglix.com
Price Rise+1
Price Up 4 hours ago

Lab Plus Personal Centrifuge 143x166x184, LP-8987

Check Price History
Lab Plus Rechargeable Biological Microscope, LP-13203-picture-17
₹88973
moglix.com small logo
Moglix.com
Price Drop-1
Price Down 4 hours ago

Lab Plus Rechargeable Biological Microscope, LP-13203

Check Price History
Lab Plus Biconvex Lens, Size: 30x2.17 mm, LP-13061 (Pack of 5)-picture-21
₹20613
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 2 months ago

Lab Plus Biconvex Lens, Size: 30x2.17 mm, LP-13061 (Pack of 5)

Check Price History
Lab Plus Card Board Mailer, LP-12848 (Pack of 50)-picture-22
₹3741
moglix.com small logo
Moglix.com
Price Rise+1
Price Up 1 month ago

Lab Plus Card Board Mailer, LP-12848 (Pack of 50)

Check Price History
Labpro 118 32L Constant Temperature Refrigeration-Liquid Bath-picture-23
₹89115
moglix.com small logo
Moglix.com
Price Drop-1
Price Down 2 weeks ago

Labpro 118 32L Constant Temperature Refrigeration-Liquid Bath

Check Price History
Lab Plus Mini Centrifuge, LP-9007 (Pack of 5)-picture-25
₹252013
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 2 months ago

Lab Plus Mini Centrifuge, LP-9007 (Pack of 5)

Check Price History
Remi 8x15ml 4400rpm Metal Laboratory Centrifuge, R-4C-picture-26
₹32649
moglix.com small logo
Moglix.com
Price Rise+170
Price Up 2 weeks ago

Remi 8x15ml 4400rpm Metal Laboratory Centrifuge, R-4C

Check Price History
Lab Plus SS Base Mold Stainless Steel, LP-12897 (Pack of 5)-picture-28
₹149748
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 2 months ago

Lab Plus SS Base Mold Stainless Steel, LP-12897 (Pack of 5)

Check Price History
Lab Plus Paraffin Hot Plate, LP-12857-picture-30
₹53430
moglix.com small logo
Moglix.com
Price Rise+2
Price Up 1 month ago

Lab Plus Paraffin Hot Plate, LP-12857

Check Price History
Lab Plus Hot Stirrer AC 100 V 50/60Hz, LP-12511 (Pack of 5)-picture-32
₹314549
moglix.com small logo
Moglix.com
Price Drop-3
Price Down 2 months ago

Lab Plus Hot Stirrer AC 100 V 50/60Hz, LP-12511 (Pack of 5)

Check Price History
Lab Plus Ceramic Hot Stirrer Analog Type, LP-12498 (Pack of 5)-picture-34
₹377476
moglix.com small logo
Moglix.com
Price Drop-3
Price Down 2 months ago

Lab Plus Ceramic Hot Stirrer Analog Type, LP-12498 (Pack of 5)

Check Price History
Lab Plus Ultra Stirrer AC 100 V 50/60Hz 250 to 2500, LP-270-picture-35
₹99529
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 1 month ago

Lab Plus Ultra Stirrer AC 100 V 50/60Hz 250 to 2500, LP-270

Check Price History
Lab Plus Biconvex Lens, Size: 20x1.98 mm, LP-13090-picture-36
₹7642
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 1 month ago

Lab Plus Biconvex Lens, Size: 20x1.98 mm, LP-13090

Check Price History
Lab Plus Biconvex Lens, Size: 10x1.2 mm, LP-13086 (Pack of 5)-picture-37
₹45178
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 2 months ago

Lab Plus Biconvex Lens, Size: 10x1.2 mm, LP-13086 (Pack of 5)

Check Price History
Labpro 137 Platform Rotary Shaker for 81 flasks of 500ml-picture-38
₹76583
moglix.com small logo
Moglix.com
Price Drop-1
Price Down 2 weeks ago

Labpro 137 Platform Rotary Shaker for 81 flasks of 500ml

Check Price History
Lab Plus Centrifuge 16x6.5x105x20 mm, LP-8990 (Pack of 5)-picture-39
₹1034118
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 2 months ago

Lab Plus Centrifuge 16x6.5x105x20 mm, LP-8990 (Pack of 5)

Check Price History
Lab Plus Probio Base Mold, LP-12876 (Pack of 5)-picture-42
₹326802
moglix.com small logo
Moglix.com
Price Drop-3
Price Down 1 month ago

Lab Plus Probio Base Mold, LP-12876 (Pack of 5)

Check Price History
Lab Plus High Speed Stirrer, LP-240 (Pack of 5)-picture-44
₹1447178
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 1 month ago

Lab Plus High Speed Stirrer, LP-240 (Pack of 5)

Check Price History
Lab Plus Probio Embedding Ring, LP-12885 (Pack of 1000)-picture-45
₹26241
moglix.com small logo
Moglix.com
Price Drop-1
Price Down 4 hours ago

Lab Plus Probio Embedding Ring, LP-12885 (Pack of 1000)

Check Price History
NSAW TTR-18 15ml 18 Slow Speed Test Tube Rotator, NSAW-1490-picture-46
₹24809
moglix.com small logo
Moglix.com
Price Drop-1
Price Down 1 month ago

NSAW TTR-18 15ml 18 Slow Speed Test Tube Rotator, NSAW-1490

Check Price History
Lab Plus Micro Centrifuge, LP-8986 (Pack of 5)-picture-47
₹1292664
moglix.com small logo
Moglix.com
Price Drop-1
Price Down 1 month ago

Lab Plus Micro Centrifuge, LP-8986 (Pack of 5)

Check Price History
Lab Plus Lab Rocking Shaker 80 Dimples Pad, LP-33 (Pack of 5)-picture-48
₹45178
moglix.com small logo
Moglix.com
Price Drop-2
Price Down 1 month ago

Lab Plus Lab Rocking Shaker 80 Dimples Pad, LP-33 (Pack of 5)

Check Price History