Search CheapestInIndia.com

Evm wired optical mouse - 3d office mouse with 1200 dpi resolution, usb interface, plug and play - 1 year warranty (evm-m513-grey)

amazon.in small logoAmazon.in
EVM Wired Optical Mouse - 3D Office Mouse with 1200 DPI Resolution, USB Interface, Plug and Play - 1 Year Warranty (EVM-M513-Grey) image 1
₹189
*

Amazon Price History - Evm wired optical mouse 3 d
From: 17 May 2025 to 26 Nov 2025

amazon.in EVM Wired Optical Mouse - 3D Office Mouse with 1200 DPI Resolution, USB Interface, Plug and Play - 1 Year Warranty (EVM-M513-Grey) Price History Graph from 17 May 2025 to 26 Nov 2025

Price History amazon.in EVM Wired Optical Mouse - 3D Office Mouse with 1200 DPI Resolution, USB Interface, Plug and Play - 1 Year Warranty (EVM-M513-Grey)

NoDatePriceChange
126 Nov 20251890
228 Oct 2025189
+20
316 Sep 2025169 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
3
Amazon Rating
4.9/5
Lowest Price Detected₹ 169
Lowest Price Date16 sep 2025
Best Price Was About2 months ago
Price History Available Since17 May 2025

EVM Wired Optical Mouse - 3D Office Mouse with 1200 DPI Resolution, USB Interface, Plug and Play - 1 Year Warranty (EVM-M513-Grey)
Price In India Details And Price History Trend From: 17 May 2025 to 26 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : moderate

The current price is ₹189, which is ₹20 (11.8%) higher than the best price of ₹169 last seen on 16 Sep 2025. Over the 193 day price history period, prices have ranged from ₹169 to ₹299, with an average of ₹214. The pricing shows high volatility with significant fluctuations, and the overall trend is favorable for consumers as prices are getting cheaper. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 8 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has moderate confidence due to price volatility, so continue monitoring trends. The next estimated price target is ₹176, trending lower, making this potentially a good time to wait for an even better deal.

Similar products from Amazon.in

Hama MC-200 Optical 3-Button Mouse, Cabled, 1200 DPI, Black-picture-26
₹390
amazon.in small logo
Amazon.in
Price Drop-9
Price Down 1 month ago

Hama MC-200 Optical 3-Button Mouse, Cabled, 1200 DPI, Black

Check Price History