Search CheapestInIndia.com

Evm wired keyboard | spill-resistant, 104 keys, smooth keystrokes | uv paint coated, usb connectivity - 1 year warranty (evm-wdk-315)

amazon.in small logoAmazon.in
EVM Wired Keyboard | Spill-Resistant, 104 Keys, Smooth Keystrokes | UV Paint Coated, USB Connectivity - 1 Year Warranty (EVM-WDK-315) image 1
₹269
*

Amazon Price History - Evm wired keyboard spill resistant 104
From: 15 Sep 2025 to 5 Oct 2025

amazon.in EVM Wired Keyboard | Spill-Resistant, 104 Keys, Smooth Keystrokes | UV Paint Coated, USB Connectivity - 1 Year Warranty (EVM-WDK-315) Price History Graph from 15 Sep 2025 to 5 Oct 2025

amazon.in Price History Table - EVM Wired Keyboard | Spill-Resistant, 104 ...

NoTimePriceChange
15 Oct 2025269
+4
21 Oct 2025265
+22
325 Sep 2025243

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
1
Amazon Rating
1/5
Lowest Price Detected₹ 243
Lowest Price Date25 sep 2025
Best Price Was About2 weeks ago
Price History Available Since15 Sep 2025

CheapestInIndia Price Intelligence & Research Analysis Confidence : high

The current price is ₹269, which is ₹26 (10.7%) higher than the best price of ₹243 last seen on 25 Sep 2025. Over the 20 day price history period, prices have ranged from ₹243 to ₹269, with an average of ₹262. The pricing has been quite stable with low volatility, with prices remaining relatively stable overall. In terms of recent activity, there has been 1 price change this week, 3 this month, and 3 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹266, trending lower, making this potentially a good time to wait for an even better deal.

Similar products from Amazon.in

Razer Huntsman V2 - Optical Gaming Keyboard (Linear Red Switch)-picture-14
₹12039
amazon.in small logo
Amazon.in
Price Drop-1343
Price Down 1 week ago

Razer Huntsman V2 - Optical Gaming Keyboard (Linear Red Switch)

Check Price History
CE77JD Microwave Oven Membrane Keypad (Black)-picture-18
₹650
amazon.in small logo
Amazon.in
No Recent Price Movement

CE77JD Microwave Oven Membrane Keypad (Black)

Check Price History
HP K120 Wired Keyboard-picture-23
₹399
amazon.in small logo
Amazon.in
Price Drop-116
Price Down 2 weeks ago

HP K120 Wired Keyboard

Check Price History
HP K270 Wireless Keyboard-picture-25
₹499
amazon.in small logo
Amazon.in
Price Drop-77
Price Down 1 day ago

HP K270 Wireless Keyboard

Check Price History