Search CheapestInIndia.com

Evm motherboard h61fhl ddr3 with nvme slot -for intel h61 chipset- ddr3 1066/1333 ram, sata 3gb/s ports, pcie x16 and x1 slots, mic in/line in/line out, 8 usb 2.0 ports (evmh61fhl)

amazon.in small logoAmazon.in
EVM Motherboard H61FHL DDR3 with NVMe Slot -for Intel H61 Chipset- DDR3 1066/1333 RAM, SATA 3Gb/s Ports, PCIe x16 and x1 Slots, Mic in/Line in/Line Out, 8 USB 2.0 Ports (EVMH61FHL) image 1EVM Motherboard H61FHL DDR3 with NVMe Slot -for Intel H61 Chipset- DDR3 1066/1333 RAM, SATA 3Gb/s Ports, PCIe x16 and x1 Slots, Mic in/Line in/Line Out, 8 USB 2.0 Ports (EVMH61FHL) image 2
₹1499
*

Amazon Price History - Evm motherboard h61 fhl ddr3 with nv me
From: 13 Jul 2025 to 23 Nov 2025

amazon.in EVM Motherboard H61FHL DDR3 with NVMe Slot -for Intel H61 Chipset- DDR3 1066/1333 RAM, SATA 3Gb/s Ports, PCIe x16 and x1 Slots, Mic in/Line in/Line Out, 8 USB 2.0 Ports (EVMH61FHL) Price History Graph from 13 Jul 2025 to 23 Nov 2025

Price History amazon.in EVM Motherboard H61FHL DDR3 with NVMe Slot -for Intel H61 Chipset- DDR3 1066/1333 RAM, SATA 3Gb/s Ports, PCIe x16 and x1 Slots, Mic in/Line in/Line Out, 8 USB 2.0 Ports (EVMH61FHL)

NoDatePriceChange
123 Nov 202514990
24 Nov 20251499
+150
34 Nov 20251349
-82
430 Oct 20251431
+82
526 Oct 20251349 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
30
Amazon Rating
3.4/5
Lowest Price Detected₹ 1109
Lowest Price Date31 jul 2025
Best Price Was About4 months ago
Price History Available Since13 Jul 2025

EVM Motherboard H61FHL DDR3 with NVMe Slot -for Intel H61 Chipset- DDR3 1066/1333 RAM, SATA 3Gb/s Ports, PCIe x16 and x1 Slots, Mic in/Line in/Line Out, 8 USB 2.0 Ports (EVMH61FHL)
Price In India Details And Price History Trend From: 13 Jul 2025 to 23 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : moderate

The current price is ₹1,499, which is ₹390 (35.2%) higher than the best price of ₹1,109 last seen on 31 Jul 2025. Over the 133 day price history period, prices have ranged from ₹1,109 to ₹1,499, with an average of ₹1,289. The pricing shows moderate volatility, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 3 this month, and 10 over the past year. Consider waiting before making a purchase as prices are rising and better deals may be available later.

Our analysis has moderate confidence due to price volatility, so continue monitoring trends. The next estimated price target is ₹1,538, trending higher, making this likely the current best offer.

Similar products from Amazon.in

Raspberry Pi 4 Model B (8GB)-picture-14
₹8879
amazon.in small logo
Amazon.in
Price Rise+60
Price Up 1 week ago

Raspberry Pi 4 Model B (8GB)

Check Price History
Raspberry Pi 5 (16GB)-picture-21
₹15439
amazon.in small logo
Amazon.in
Price Drop-2051
Price Down 3 days ago

Raspberry Pi 5 (16GB)

Check Price History