Search CheapestInIndia.com

Evm envault usb 2.0 flash drive-high performance 32 gb pen drive compatible with desktop computer usb 2.0 metal case

flipkart.com small logoFlipkart.comColor : Silver
EVM EnVault USB 2.0 Flash Drive-High Performance 32 GB Pen Drive Compatible with Desktop Computer USB 2.0 Metal Case image 1EVM EnVault USB 2.0 Flash Drive-High Performance 32 GB Pen Drive Compatible with Desktop Computer USB 2.0 Metal Case image 2EVM EnVault USB 2.0 Flash Drive-High Performance 32 GB Pen Drive Compatible with Desktop Computer USB 2.0 Metal Case image 3EVM EnVault USB 2.0 Flash Drive-High Performance 32 GB Pen Drive Compatible with Desktop Computer USB 2.0 Metal Case image 4EVM EnVault USB 2.0 Flash Drive-High Performance 32 GB Pen Drive Compatible with Desktop Computer USB 2.0 Metal Case image 5
₹399
*

Flipkart Price History - Evm en vault usb 2 0 flash drive high
From: 28 May 2025 to 22 Nov 2025

flipkart.com EVM EnVault USB 2.0 Flash Drive-High Performance 32 GB Pen Drive Compatible with Desktop Computer USB 2.0 Metal Case Price History Graph from 28 May 2025 to 22 Nov 2025

Price History flipkart.com EVM EnVault USB 2.0 Flash Drive-High Performance 32 GB Pen Drive Compatible with Desktop Computer USB 2.0 Metal Case

NoDatePriceChange
122 Nov 20253990
25 Nov 2025399
+80
325 Oct 2025319
+20
410 Oct 2025299
+20
522 Sep 2025279 

Product Info

FeatureValue
StoreFlipkart.com
Color
Flipkart Reviews
30
Flipkart Rating
4.1/5
Lowest Price Detected₹ 279
Lowest Price Date22 sep 2025
Best Price Was About2 months ago
Price History Available Since28 May 2025

EVM EnVault USB 2.0 Flash Drive-High Performance 32 GB Pen Drive Compatible with Desktop Computer USB 2.0 Metal Case
Price In India Details And Price History Trend From: 28 May 2025 to 22 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : moderate

The current price is ₹399, which is ₹120 (43.0%) higher than the best price of ₹279 last seen on 22 Sep 2025. Over the 178 day price history period, prices have ranged from ₹279 to ₹399, with an average of ₹337. The pricing shows moderate volatility, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 1 this month, and 10 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has moderate confidence due to price volatility, so continue monitoring trends. The next estimated price target is ₹411, trending higher, making this likely the current best offer.

Similar products from Flipkart.com

ADATA 1 TB External Solid State Drive (SSD)-picture-11
₹8639
flipkart.com small logo
Flipkart.com
Price Rise+1440
Price Up 1 month ago

ADATA 1 TB External Solid State Drive (SSD)

Check Price History
HP MX330 64 GB MicroSD Card Class 10 100 MB/sMemory Card-picture-15
₹650
flipkart.com small logo
Flipkart.com
Price Drop-30
Price Down 2 weeks ago

HP MX330 64 GB MicroSD Card Class 10 100 MB/sMemory Card

Check Price History
SanDisk Extreme 256 GB SDXC Class 10 100 MB/sMemory Card-picture-20
₹3759
flipkart.com small logo
Flipkart.com
Price Rise+1450
Price Up 2 months ago

SanDisk Extreme 256 GB SDXC Class 10 100 MB/sMemory Card

Check Price History
ULTRABYTES 1 TB External Hard Disk Drive (HDD)-picture-24
₹3459
flipkart.com small logo
Flipkart.com
Price Rise+356
Price Up 4 weeks ago

ULTRABYTES 1 TB External Hard Disk Drive (HDD)

Check Price History
Silicon Power 2 TB Wired External Hard Disk Drive (HDD)-picture-25
₹9049
flipkart.com small logo
Flipkart.com
Price Rise+2230
Price Up 3 weeks ago

Silicon Power 2 TB Wired External Hard Disk Drive (HDD)

Check Price History