Search CheapestInIndia.com

Evm enstore 16gb metal usb 2.0 flash drive - high read speeds up to 15mb/s & write speeds up to 8mb/s - durable metal casing - ideal for data transfer & storage - (evmpd/16gb)

amazon.in small logoAmazon.in
EVM EnStore 16GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/16GB) image 1
₹349
*

Amazon Price History - Evm en store 16 gb metal usb 2 0
From: 12 Sep 2025 to 11 Nov 2025

amazon.in EVM EnStore 16GB Metal USB 2.0 Flash Drive - High Read Speeds up to 15MB/s & Write Speeds up to 8MB/s - Durable Metal Casing - Ideal for Data Transfer & Storage - (EVMPD/16GB) Price History Graph from 12 Sep 2025 to 11 Nov 2025

amazon.in Price History Table - EVM EnStore 16GB Metal USB 2.0 ...

NoTimePriceChange
111 Nov 2025349
+90
23 Nov 2025259
+40
324 Sep 2025219 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
1652
Amazon Rating
4.1/5
Lowest Price Detected₹ 219
Lowest Price Date24 sep 2025
Best Price Was About2 months ago
Price History Available Since12 Sep 2025

CheapestInIndia Price Intelligence & Research Analysis Confidence : moderate

The current price is ₹349, which is ₹130 (59.4%) higher than the best price of ₹219 last seen on 24 Sep 2025. Over the 60 day price history period, prices have ranged from ₹219 to ₹349, with an average of ₹264. The pricing shows high volatility with significant fluctuations, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 1 this month, and 3 over the past year. Consider waiting before making a purchase as prices are rising and better deals may be available later.

Our analysis has moderate confidence due to price volatility, so continue monitoring trends. The next estimated price target is ₹362, trending higher, making this likely the current best offer.

Similar products from Amazon.in

HP x796w 64GB USB 3.2 Flash Drive-picture-10
₹749
amazon.in small logo
Amazon.in
Price Rise+50
Price Up 1 week ago

HP x796w 64GB USB 3.2 Flash Drive

Check Price History
HP v236w 16GB USB 2.0 Pen Drive, Multi-picture-11
₹369
amazon.in small logo
Amazon.in
Price Rise+20
Price Up 3 weeks ago

HP v236w 16GB USB 2.0 Pen Drive, Multi

Check Price History
Kingston Exodia M 64B USB Flash Drive, 64 GB, Pack of 1-picture-16
₹569
amazon.in small logo
Amazon.in
Price Drop-20
Price Down 2 weeks ago

Kingston Exodia M 64B USB Flash Drive, 64 GB, Pack of 1

Check Price History
HP x796w 256GB USB 3.2 Flash Drive-picture-17
₹2320
amazon.in small logo
Amazon.in
Price Rise+165
Price Up 1 day ago

HP x796w 256GB USB 3.2 Flash Drive

Check Price History
Acer 32GB UF200 USB 2.0 Flash Drive-Metal-picture-20
₹339
amazon.in small logo
Amazon.in
Price Drop-60
Price Down 6 days ago

Acer 32GB UF200 USB 2.0 Flash Drive-Metal

Check Price History
HP 818w 32GB USB 3.2 Flash Drive Silver Metal-picture-25
₹474
amazon.in small logo
Amazon.in
Price Drop-25
Price Down 1 week ago

HP 818w 32GB USB 3.2 Flash Drive Silver Metal

Check Price History
Acer 64GB USB 3.2 Gen 1 UM310 Pen Drive-picture-31
₹699
amazon.in small logo
Amazon.in
Price Rise+30
Price Up 6 days ago

Acer 64GB USB 3.2 Gen 1 UM310 Pen Drive

Check Price History
512GB Pen Drive 51 USB Flash Drive for Computer-picture-32
₹1763
amazon.in small logo
Amazon.in
Price Drop-400
Price Down 1 week ago

512GB Pen Drive 51 USB Flash Drive for Computer

Check Price History
ACER 64GB UP300 Black 3.0-picture-34
₹699
amazon.in small logo
Amazon.in
Price Rise+54
Price Up 2 days ago

ACER 64GB UP300 Black 3.0

Check Price History