Search CheapestInIndia.com

Evm enstick 128gb usb 3.2 gen 1 pendrive - high speed up to 200mb/s read - ideal for fast data transfer & storage solution with durable design - (evmpda3.2/128gb)

amazon.in small logoAmazon.in
EVM EnStick 128GB USB 3.2 Gen 1 Pendrive - High Speed up to 200MB/s Read - Ideal for Fast Data Transfer & Storage Solution with Durable Design - (EVMPDA3.2/128GB) image 1
₹828
*

Amazon Price History - Evm en stick 128 gb usb 3 2 gen
From: 1 May 2025 to 20 Nov 2025

amazon.in EVM EnStick 128GB USB 3.2 Gen 1 Pendrive - High Speed up to 200MB/s Read - Ideal for Fast Data Transfer & Storage Solution with Durable Design - (EVMPDA3.2/128GB) Price History Graph from 1 May 2025 to 20 Nov 2025

Price History amazon.in EVM EnStick 128GB USB 3.2 Gen 1 Pendrive - High Speed up to 200MB/s Read - Ideal for Fast Data Transfer & Storage Solution with Durable Design - (EVMPDA3.2/128GB)

NoDatePriceChange
120 Nov 2025828
+79
231 Jul 2025749
-97
330 Jul 2025846 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
260
Amazon Rating
4.1/5
Lowest Price Detected₹ 699
Lowest Price Date1 may 2025
Best Price Was About7 months ago
Price History Available Since1 May 2025

EVM EnStick 128GB USB 3.2 Gen 1 Pendrive - High Speed up to 200MB/s Read - Ideal for Fast Data Transfer & Storage Solution with Durable Design - (EVMPDA3.2/128GB)
Price In India Details And Price History Trend From: 1 May 2025 to 20 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : high

The current price is ₹828, which is ₹129 (18.5%) higher than the best price of ₹699 last seen on 1 May 2025. Over the 203 day price history period, prices have ranged from ₹699 to ₹846, with an average of ₹768. The pricing shows moderate volatility, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 5 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹843, trending higher, making this likely the current best offer.

Similar products from Amazon.in

HP USB 3.2 Flash Drive 64GB 796W-picture-11
₹670
amazon.in small logo
Amazon.in
Price Drop-29
Price Down 9 hours ago

HP USB 3.2 Flash Drive 64GB 796W

Check Price History
Acer 128GB USB 3.2 Gen 1 UM310 Pen Drive-picture-15
₹999
amazon.in small logo
Amazon.in
Price Drop-100
Price Down 1 day ago

Acer 128GB USB 3.2 Gen 1 UM310 Pen Drive

Check Price History
Digitek (Dud 64GB 3.2) Pen Drive V3.2 U Disk 64GB-picture-20
₹539
amazon.in small logo
Amazon.in
Price Rise+41
Price Up 3 days ago

Digitek (Dud 64GB 3.2) Pen Drive V3.2 U Disk 64GB

Check Price History
Acer 64GB USB 3.2 Gen 1 UM310 Pen Drive-picture-26
₹555
amazon.in small logo
Amazon.in
Price Drop-144
Price Down 1 day ago

Acer 64GB USB 3.2 Gen 1 UM310 Pen Drive

Check Price History
512GB Pen Drive 51 USB Flash Drive for Computer-picture-28
₹1763
amazon.in small logo
Amazon.in
Price Drop-400
Price Down 2 weeks ago

512GB Pen Drive 51 USB Flash Drive for Computer

Check Price History
ACER 64GB UP300 Black 3.0-picture-31
₹499
amazon.in small logo
Amazon.in
Price Drop-46
Price Down 9 hours ago

ACER 64GB UP300 Black 3.0

Check Price History