Search CheapestInIndia.com

Evm enmag pro 10000mah mag-safe powerbank - fast charging with magnetic foldable stand compatible with ios and qi devices type-c input/output, 15w wireless output - 2 years warranty (evm-p0308-white)

amazon.in small logoAmazon.in
EVM EnMag Pro 10000mAh Mag-Safe Powerbank - Fast Charging with Magnetic Foldable Stand Compatible with iOS and Qi Devices Type-C Input/Output, 15W Wireless Output - 2 Years Warranty (EVM-P0308-White) image 1
₹2211
*

Amazon Price History - Evm en mag pro 10000m ah mag safe powerbank
From: 5 May 2025 to 28 Nov 2025

amazon.in EVM EnMag Pro 10000mAh Mag-Safe Powerbank - Fast Charging with Magnetic Foldable Stand Compatible with iOS and Qi Devices Type-C Input/Output, 15W Wireless Output - 2 Years Warranty (EVM-P0308-White) Price History Graph from 5 May 2025 to 28 Nov 2025

Price History amazon.in EVM EnMag Pro 10000mAh Mag-Safe Powerbank - Fast Charging with Magnetic Foldable Stand Compatible with iOS and Qi Devices Type-C Input/Output, 15W Wireless Output - 2 Years Warranty (EVM-P0308-White)

NoDatePriceChange
128 Nov 202522110
221 Nov 20252211
-2
38 Nov 20252213 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
13
Amazon Rating
3.8/5
Lowest Price Detected₹ 2199
Lowest Price Date5 may 2025
Best Price Was About7 months ago
Price History Available Since5 May 2025

EVM EnMag Pro 10000mAh Mag-Safe Powerbank - Fast Charging with Magnetic Foldable Stand Compatible with iOS and Qi Devices Type-C Input/Output, 15W Wireless Output - 2 Years Warranty (EVM-P0308-White)
Price In India Details And Price History Trend From: 5 May 2025 to 28 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : high

The current price is ₹2,211, which is ₹12 (0.5%) higher than the best price of ₹2,199 last seen on 5 May 2025. Over the 207 day price history period, prices have ranged from ₹2,199 to ₹2,214, with an average of ₹2,210. The pricing has been quite stable with low volatility, with prices remaining relatively stable overall. In terms of recent activity, there have been 0 price changes this week, 2 this month, and 3 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹2,210, trending lower, making this potentially a good time to wait for an even better deal.

Similar products from Amazon.in

Moerdon Laptop Power Bank (50K mAh)-picture-14
₹7999
amazon.in small logo
Amazon.in
No Recent Price Movement

Moerdon Laptop Power Bank (50K mAh)

Check Price History
boAt EnergyShroom PB331 MagnaCharge Powerbank(Wine Red)-picture-20
₹1599
amazon.in small logo
Amazon.in
Price Rise+200
Price Up 4 hours ago

boAt EnergyShroom PB331 MagnaCharge Powerbank(Wine Red)

Check Price History
Wayona 20k mAh Fast Charging Power Bank Energie Tank White-picture-22
₹999
amazon.in small logo
Amazon.in
Price Drop-200
Price Down 4 hours ago

Wayona 20k mAh Fast Charging Power Bank Energie Tank White

Check Price History
Sharge Starship Seer Yellow-picture-35
₹5446
amazon.in small logo
Amazon.in
Price Rise+48
Price Up 4 days ago

Sharge Starship Seer Yellow

Check Price History