Search CheapestInIndia.com

Evm 8gb ddr3 laptop ram 1333mhz so-dimm memory - boost laptop speed and performance with low latency and durable design - 10-years warranty (evmt8g1333s86p)

amazon.in small logoAmazon.in
EVM 8GB DDR3 Laptop RAM 1333MHz So-DIMM Memory - Boost Laptop Speed and Performance with Low Latency and Durable Design - 10-Years Warranty (EVMT8G1333S86P) image 1EVM 8GB DDR3 Laptop RAM 1333MHz So-DIMM Memory - Boost Laptop Speed and Performance with Low Latency and Durable Design - 10-Years Warranty (EVMT8G1333S86P) image 2EVM 8GB DDR3 Laptop RAM 1333MHz So-DIMM Memory - Boost Laptop Speed and Performance with Low Latency and Durable Design - 10-Years Warranty (EVMT8G1333S86P) image 3EVM 8GB DDR3 Laptop RAM 1333MHz So-DIMM Memory - Boost Laptop Speed and Performance with Low Latency and Durable Design - 10-Years Warranty (EVMT8G1333S86P) image 4EVM 8GB DDR3 Laptop RAM 1333MHz So-DIMM Memory - Boost Laptop Speed and Performance with Low Latency and Durable Design - 10-Years Warranty (EVMT8G1333S86P) image 5
₹899
*

Amazon Price History - Evm 8 gb ddr3 laptop ram 1333 m hz
From: 10 Jul 2025 to 25 Oct 2025

amazon.in EVM 8GB DDR3 Laptop RAM 1333MHz So-DIMM Memory - Boost Laptop Speed and Performance with Low Latency and Durable Design - 10-Years Warranty (EVMT8G1333S86P) Price History Graph from 10 Jul 2025 to 25 Oct 2025

amazon.in Price History Table - EVM 8GB DDR3 Laptop RAM 1333MHz ...

NoTimePriceChange
125 Oct 20258990
224 Oct 2025899
+160
39 Aug 2025739

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
547
Amazon Rating
3.8/5
Lowest Price Detected₹ 699
Lowest Price Date7 aug 2025
Best Price Was About3 months ago
Price History Available Since10 Jul 2025

CheapestInIndia Price Intelligence & Research Analysis Confidence : high

The current price is ₹899, which is ₹200 (28.6%) higher than the best price of ₹699 last seen on 7 Aug 2025. Over the 107 day price history period, prices have ranged from ₹699 to ₹899, with an average of ₹787. The pricing shows moderate volatility, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 6 over the past year. Consider waiting before making a purchase as prices are rising and better deals may be available later.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹919, trending higher, making this likely the current best offer.

Similar products from Amazon.in

Crucial Basics 8GB DDR4-3200 UDIMM-picture-26
₹2200
amazon.in small logo
Amazon.in
Price Drop-69
Price Down 23 hours ago

Crucial Basics 8GB DDR4-3200 UDIMM

Check Price History