Search CheapestInIndia.com

Evm 8gb ddr3 desktop ram 1333mhz long-dimm memory - boost computer speed and performance with low latency and durable design - 10-year warranty (evmt8g1333u86p)

amazon.in small logoAmazon.inBrand : evm
EVM 8GB DDR3 Desktop RAM 1333MHz Long-DIMM Memory - Boost Computer Speed and Performance with Low Latency and Durable Design - 10-Year Warranty (EVMT8G1333U86P) image 1EVM 8GB DDR3 Desktop RAM 1333MHz Long-DIMM Memory - Boost Computer Speed and Performance with Low Latency and Durable Design - 10-Year Warranty (EVMT8G1333U86P) image 2EVM 8GB DDR3 Desktop RAM 1333MHz Long-DIMM Memory - Boost Computer Speed and Performance with Low Latency and Durable Design - 10-Year Warranty (EVMT8G1333U86P) image 3EVM 8GB DDR3 Desktop RAM 1333MHz Long-DIMM Memory - Boost Computer Speed and Performance with Low Latency and Durable Design - 10-Year Warranty (EVMT8G1333U86P) image 4EVM 8GB DDR3 Desktop RAM 1333MHz Long-DIMM Memory - Boost Computer Speed and Performance with Low Latency and Durable Design - 10-Year Warranty (EVMT8G1333U86P) image 5
₹1293
*

Amazon Price History - Evm 8 gb ddr3 desktop ram 1333 m hz
From: 1 May 2025 to 26 Nov 2025

amazon.in EVM 8GB DDR3 Desktop RAM 1333MHz Long-DIMM Memory - Boost Computer Speed and Performance with Low Latency and Durable Design - 10-Year Warranty (EVMT8G1333U86P) evm Price History Graph from 1 May 2025 to 26 Nov 2025

Price History amazon.in EVM 8GB DDR3 Desktop RAM 1333MHz Long-DIMM Memory - Boost Computer Speed and Performance with Low Latency and Durable Design - 10-Year Warranty (EVMT8G1333U86P)

NoDatePriceChange
126 Nov 202512930
223 Nov 20251293
-131
316 Nov 20251424 

Product Info

FeatureValue
StoreAmazon.in
Brand
Amazon Reviews
539
Amazon Rating
3.9/5
Lowest Price Detected₹ 699
Lowest Price Date10 sep 2025
Best Price Was About3 months ago
Price History Available Since1 May 2025

EVM 8GB DDR3 Desktop RAM 1333MHz Long-DIMM Memory - Boost Computer Speed and Performance with Low Latency and Durable Design - 10-Year Warranty (EVMT8G1333U86P)
Price In India Details And Price History Trend From: 1 May 2025 to 26 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : moderate

The current price is ₹1,293, which is ₹594 (85.0%) higher than the best price of ₹699 last seen on 7 Aug 2025. Over the 209 day price history period, prices have ranged from ₹699 to ₹1,424, with an average of ₹943. The pricing shows high volatility with significant fluctuations, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 1 this month, and 8 over the past year. The price direction is uncertain, so monitor the situation for a few more days before making a decision.

Our analysis has moderate confidence due to price volatility, so continue monitoring trends. The next estimated price target is ₹1,366, trending higher, making this likely the current best offer.

Similar products from Amazon.in

Crucial RAM 8GB DDR3 1600 MHz CL11 Desktop Memory CT102464BD160B-picture-13
₹1999
amazon.in small logo
Amazon.in
Price Drop-500
Price Down 1 month ago

Crucial RAM 8GB DDR3 1600 MHz CL11 Desktop Memory CT102464BD160B

Check Price History