Search CheapestInIndia.com

Evm 16gb ddr4 desktop ram 2133mhz long-dimm memory - enhanced performance for multitasking with 10-year warranty (evmt16g2133u88p)

amazon.in small logoAmazon.in
EVM 16GB DDR4 Desktop RAM 2133MHz Long-DIMM Memory - Enhanced Performance for Multitasking with 10-Year Warranty (EVMT16G2133U88P) image 1EVM 16GB DDR4 Desktop RAM 2133MHz Long-DIMM Memory - Enhanced Performance for Multitasking with 10-Year Warranty (EVMT16G2133U88P) image 2EVM 16GB DDR4 Desktop RAM 2133MHz Long-DIMM Memory - Enhanced Performance for Multitasking with 10-Year Warranty (EVMT16G2133U88P) image 3EVM 16GB DDR4 Desktop RAM 2133MHz Long-DIMM Memory - Enhanced Performance for Multitasking with 10-Year Warranty (EVMT16G2133U88P) image 4
₹5799
*

Amazon Price History - Evm 16 gb ddr4 desktop ram 2133 m hz
From: 10 Jul 2025 to 27 Nov 2025

amazon.in EVM 16GB DDR4 Desktop RAM 2133MHz Long-DIMM Memory - Enhanced Performance for Multitasking with 10-Year Warranty (EVMT16G2133U88P) Price History Graph from 10 Jul 2025 to 27 Nov 2025

Price History amazon.in EVM 16GB DDR4 Desktop RAM 2133MHz Long-DIMM Memory - Enhanced Performance for Multitasking with 10-Year Warranty (EVMT16G2133U88P)

NoDatePriceChange
127 Nov 20255799
+3100
228 Sep 20252699
-200
38 Aug 20252899 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
41
Amazon Rating
4/5
Lowest Price Detected₹ 2299
Lowest Price Date10 jul 2025
Best Price Was About5 months ago
Price History Available Since10 Jul 2025

EVM 16GB DDR4 Desktop RAM 2133MHz Long-DIMM Memory - Enhanced Performance for Multitasking with 10-Year Warranty (EVMT16G2133U88P)
Price In India Details And Price History Trend From: 10 Jul 2025 to 27 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : moderate

The current price is ₹5,799, which is ₹3,500 (152.2%) higher than the best price of ₹2,299 last seen on 10 Jul 2025. Over the 140 day price history period, prices have ranged from ₹2,299 to ₹5,799, with an average of ₹3,245. The pricing shows high volatility with significant fluctuations, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 4 over the past year. Consider waiting before making a purchase as prices are rising and better deals may be available later.

Our analysis has moderate confidence due to price volatility, so continue monitoring trends. The next estimated price target is ₹2,699, trending lower, making this potentially a good time to wait for an even better deal.

Similar products from Amazon.in

Consistent 8GB DDR4 3200mhz Yeti Ram for Desktop PC-picture-14
₹3359
amazon.in small logo
Amazon.in
Price Drop-110
Price Down 4 days ago

Consistent 8GB DDR4 3200mhz Yeti Ram for Desktop PC

Check Price History