Search CheapestInIndia.com

Evm 1000 mb/s ethernet hub - dual usb 3.0 + type-c to rj45 gigabit ethernet adapter docking station with built-in driver - 1 year warranty (evm-gl2)

amazon.in small logoAmazon.in
EVM 1000 MB/s Ethernet HUB - Dual USB 3.0 + Type-C to RJ45 Gigabit Ethernet Adapter Docking Station with Built-in Driver - 1 Year Warranty (EVM-GL2) image 1EVM 1000 MB/s Ethernet HUB - Dual USB 3.0 + Type-C to RJ45 Gigabit Ethernet Adapter Docking Station with Built-in Driver - 1 Year Warranty (EVM-GL2) image 2EVM 1000 MB/s Ethernet HUB - Dual USB 3.0 + Type-C to RJ45 Gigabit Ethernet Adapter Docking Station with Built-in Driver - 1 Year Warranty (EVM-GL2) image 3
₹523
*

Amazon Price History - Evm 1000 mb s ethernet hub
From: 17 Sep 2025 to 20 Nov 2025

amazon.in EVM 1000 MB/s Ethernet HUB - Dual USB 3.0 + Type-C to RJ45 Gigabit Ethernet Adapter Docking Station with Built-in Driver - 1 Year Warranty (EVM-GL2) Price History Graph from 17 Sep 2025 to 20 Nov 2025

Price History amazon.in EVM 1000 MB/s Ethernet HUB - Dual USB 3.0 + Type-C to RJ45 Gigabit Ethernet Adapter Docking Station with Built-in Driver - 1 Year Warranty (EVM-GL2)

NoDatePriceChange
120 Nov 20255230
212 Nov 2025523
+5
310 Nov 2025518 

Product Info

FeatureValue
StoreAmazon.in
Amazon Reviews
35
Amazon Rating
3.4/5
Lowest Price Detected₹ 494
Lowest Price Date7 nov 2025
Best Price Was About2 weeks ago
Price History Available Since17 Sep 2025

EVM 1000 MB/s Ethernet HUB - Dual USB 3.0 + Type-C to RJ45 Gigabit Ethernet Adapter Docking Station with Built-in Driver - 1 Year Warranty (EVM-GL2)
Price In India Details And Price History Trend From: 17 Sep 2025 to 20 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : moderate

The current price is ₹523, which is ₹29 (5.9%) higher than the best price of ₹494 last seen on 7 Nov 2025. Over the 64 day price history period, prices have ranged from ₹494 to ₹689, with an average of ₹559. The pricing shows moderate volatility, and the overall trend is favorable for consumers as prices are getting cheaper. In terms of recent activity, there have been 0 price changes this week, 3 this month, and 7 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has moderate confidence due to price volatility, so continue monitoring trends. The next estimated price target is ₹504, trending lower, making this potentially a good time to wait for an even better deal.

Similar products from Amazon.in

USB Charging HUB for Laptop Notebook PC Computer (7 Port USB)-picture-25
₹299
amazon.in small logo
Amazon.in
Price Rise+100
Price Up 1 week ago

USB Charging HUB for Laptop Notebook PC Computer (7 Port USB)

Check Price History
D-Link DGS-1210-10P Web Smart Switch-picture-27
₹13250
amazon.in small logo
Amazon.in
Price Rise+5
Price Up 1 day ago

D-Link DGS-1210-10P Web Smart Switch

Check Price History
DS-3E0526P-E 24-Port Unmanaged Gigabit PoE Switch-picture-28
₹25900
amazon.in small logo
Amazon.in
Price Rise+6501
Price Up 3 months ago

DS-3E0526P-E 24-Port Unmanaged Gigabit PoE Switch

Check Price History