Search CheapestInIndia.com

Evm 10-in-1 type-c hub, hdmi 4k@30hz, vga 1080p, pd charging, usb 3.0 5gbps, usb 2.0 x2, rj45 100mbps, sd/tf card reader, 3.5mm aux port, 1-year warranty (evmchb10)

amazon.in small logoAmazon.in
EVM 10-in-1 Type-C Hub, HDMI 4K@30Hz, VGA 1080P, PD Charging, USB 3.0 5Gbps, USB 2.0 x2, RJ45 100Mbps, SD/TF Card Reader, 3.5mm Aux Port, 1-Year Warranty (EVMCHB10) image 1
₹2199
*

Amazon Price History - Evm 10 in 1 type c hub hdmi 4 k 30 hz
From: 19 Sep 2025 to 21 Nov 2025

amazon.in EVM 10-in-1 Type-C Hub, HDMI 4K@30Hz, VGA 1080P, PD Charging, USB 3.0 5Gbps, USB 2.0 x2, RJ45 100Mbps, SD/TF Card Reader, 3.5mm Aux Port, 1-Year Warranty (EVMCHB10) Price History Graph from 19 Sep 2025 to 21 Nov 2025

Price History amazon.in EVM 10-in-1 Type-C Hub, HDMI 4K@30Hz, VGA 1080P, PD Charging, USB 3.0 5Gbps, USB 2.0 x2, RJ45 100Mbps, SD/TF Card Reader, 3.5mm Aux Port, 1-Year Warranty (EVMCHB10)

NoDatePriceChange
121 Nov 202521990
227 Oct 20252199
+300
319 Sep 20251899 

Product Info

FeatureValue
StoreAmazon.in
Amazon Rating
5/5
Lowest Price Detected₹ 1899
Lowest Price Date19 sep 2025
Best Price Was About2 months ago
Price History Available Since19 Sep 2025

EVM 10-in-1 Type-C Hub, HDMI 4K@30Hz, VGA 1080P, PD Charging, USB 3.0 5Gbps, USB 2.0 x2, RJ45 100Mbps, SD/TF Card Reader, 3.5mm Aux Port, 1-Year Warranty (EVMCHB10)
Price In India Details And Price History Trend From: 19 Sep 2025 to 21 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : high

The current price is ₹2,199, which is ₹300 (15.8%) higher than the best price of ₹1,899 last seen on 19 Sep 2025. Over the 63 day price history period, prices have ranged from ₹1,899 to ₹2,199, with an average of ₹2,099. The pricing shows moderate volatility, but the overall trend is concerning as prices are getting more expensive. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 1 over the past year. Consider waiting before making a purchase as prices are rising and better deals may be available later.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹2,229, trending higher, making this likely the current best offer.

Similar products from Amazon.in

USB C to HDMI Adapter-picture-15
₹319
amazon.in small logo
Amazon.in
Price Rise+45
Price Up 1 week ago

USB C to HDMI Adapter

Check Price History
Dell DA310 USB-C Mobile Adapter-picture-21
₹8399
amazon.in small logo
Amazon.in
Price Drop-599
Price Down 3 days ago

Dell DA310 USB-C Mobile Adapter

Check Price History
HP USB-C 7-in-1 Hub-picture-22
₹1743
amazon.in small logo
Amazon.in
Price Rise+5
Price Up 3 days ago

HP USB-C 7-in-1 Hub

Check Price History
FINGERS Quadrant U2.0 4-Port USB Hub - Black-picture-30
₹550
amazon.in small logo
Amazon.in
Price Rise+55
Price Up 4 weeks ago

FINGERS Quadrant U2.0 4-Port USB Hub - Black

Check Price History