Search CheapestInIndia.com

Br biochem 10 l capacity 30-200 rpm speed water bath shaker, br-wbs-100

industrybuying.com small logoIndustrybuying.comBrand : br biochem
BR Biochem 10 L Capacity 30-200 RPM Speed Water Bath Shaker, BR-WBS-100 image 1
₹283199
*

Industrybuying Price History - Br biochem 10 l capacity 30 200
From: 8 Feb 2025 to 25 Nov 2025

industrybuying.com BR Biochem 10 L Capacity 30-200 RPM Speed Water Bath Shaker, BR-WBS-100 br biochem Price History Graph from 8 Feb 2025 to 25 Nov 2025

Price History industrybuying.com BR Biochem 10 L Capacity 30-200 RPM Speed Water Bath Shaker, BR-WBS-100

NoDatePriceChange
125 Nov 20252831990
225 Apr 2025283199
+1
33 Mar 2025283198.8 

Product Info

FeatureValue
StoreIndustrybuying.com
Brand
Lowest Price Detected₹ 271398.8
Lowest Price Date8 feb 2025
Best Price Was About10 months ago
Price History Available Since8 Feb 2025

BR Biochem 10 L Capacity 30-200 RPM Speed Water Bath Shaker, BR-WBS-100
Price In India Details And Price History Trend From: 8 Feb 2025 to 25 Nov 2025

Powered By: CheapestInIndia Price Intelligence & Research AnalysisConfidence : high

The current price is ₹283,199, which is ₹11,800.2 (4.3%) higher than the best price of ₹271,398.8 last seen on 8 Feb 2025. Over the 290 day price history period, prices have ranged from ₹271,398.8 to ₹283,199, with an average of ₹280,249. The pricing has been quite stable with low volatility, with prices remaining relatively stable overall. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 2 over the past year. If you need this product now, it's a reasonable time to buy as prices are stable, but you might want to monitor for potential better deals.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹282,019, trending lower, making this potentially a good time to wait for an even better deal.

Related products

BR Biochem 10.5 L Capacity Liquid Nitrogen Container, BR-10-picture-10
₹42479
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem 10.5 L Capacity Liquid Nitrogen Container, BR-10

Check Price History

Similar products from Industrybuying.com

BR Biochem 20 L Capacity 360 W Power Ultrasonic Cleaner, BR-20L-picture-10
₹99119
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem 20 L Capacity 360 W Power Ultrasonic Cleaner, BR-20L

Check Price History
Polylab 10 Slides Mailer - 62111-picture-11
₹695
industrybuying.com small logo
Industrybuying.com
Price Drop-35
Price Down 3 weeks ago

Polylab 10 Slides Mailer - 62111

Check Price History
LABTOP LLR-100 Laboratory Refrigerator-picture-12
₹153399
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

LABTOP LLR-100 Laboratory Refrigerator

Check Price History
LABTOP LLR-200 Laboratory Refrigerator-picture-13
₹188799
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

LABTOP LLR-200 Laboratory Refrigerator

Check Price History
LABTOP LBR-300 Blood Bank Refrigerator-picture-14
₹271399
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

LABTOP LBR-300 Blood Bank Refrigerator

Check Price History
BR Biochem 40-200 RPM LED Display Orbital Shaker, BI-OS-200-picture-15
₹54279
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem 40-200 RPM LED Display Orbital Shaker, BI-OS-200

Check Price History
Borosil Shaker 10-80Rpm 1003Ds0000080R-picture-16
₹41299
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

Borosil Shaker 10-80Rpm 1003Ds0000080R

Check Price History
BR Biochem (0 to 16.00 pH) Measurement Range pH Meter, BR-PH-502-picture-18
₹46019
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem (0 to 16.00 pH) Measurement Range pH Meter, BR-PH-502

Check Price History
Ralco 0.995-1.030 Range Soil Hydrometer-picture-19
₹341
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 6 months ago

Ralco 0.995-1.030 Range Soil Hydrometer

Check Price History
Neuation iFUGE D08 5400RPM Doctor Centrifuge with Combi Rotor-picture-20
₹34219
industrybuying.com small logo
Industrybuying.com
Price Rise+220
Price Up 7 months ago

Neuation iFUGE D08 5400RPM Doctor Centrifuge with Combi Rotor

Check Price History
BR Biochem 65 L Capacity Liquid Nitrogen Container With Racks & Boxes, BR-65-216-picture-21
₹377599
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem 65 L Capacity Liquid Nitrogen Container With Racks & Boxes, BR-65-216

Check Price History
Ralco 94-104% Range Alchohol Meter-picture-22
₹258
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 6 months ago

Ralco 94-104% Range Alchohol Meter

Check Price History
Labomed TCM-400 TR Research Inverted Trinocular Microscope-picture-23
₹236590
industrybuying.com small logo
Industrybuying.com
Price Rise+71391
Price Up 1 month ago

Labomed TCM-400 TR Research Inverted Trinocular Microscope

Check Price History
Weswox WVM-20 Vortex Shaker-picture-24
₹9675
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

Weswox WVM-20 Vortex Shaker

Check Price History
BR Biochem 200 Kg/24 Hr Ice Flaking Machine with Fully Automatic Controller, BRIF-200-picture-25
₹424772
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem 200 Kg/24 Hr Ice Flaking Machine with Fully Automatic Controller, BRIF-200

Check Price History
Ralco 1.000- 1.100 Range Heavy Liquid Density Hydrometer-picture-28
₹188
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 6 months ago

Ralco 1.000- 1.100 Range Heavy Liquid Density Hydrometer

Check Price History
Japsin Instrumentation Specific Gravity / Baume Hydrometer Range 00-70 With 250 ML Cylinder-picture-29
₹589
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

Japsin Instrumentation Specific Gravity / Baume Hydrometer Range 00-70 With 250 ML Cylinder

Check Price History
Japsin Instrumentation Sikes Hydrometer Range 40-60 for Liquor Special With 100 ML Cylinder-picture-30
₹955
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

Japsin Instrumentation Sikes Hydrometer Range 40-60 for Liquor Special With 100 ML Cylinder

Check Price History
Ralco 10-20 Range Brix Hydrometer with Built in Thermometer-picture-31
₹483
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 6 months ago

Ralco 10-20 Range Brix Hydrometer with Built in Thermometer

Check Price History
Vinsyst VTD Bulk Density Tester Height 25 mm-picture-32
₹51919
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

Vinsyst VTD Bulk Density Tester Height 25 mm

Check Price History
Polylab 100 Slides Slide Box - 62106-picture-33
₹2005
industrybuying.com small logo
Industrybuying.com
Price Drop-118
Price Down 3 weeks ago

Polylab 100 Slides Slide Box - 62106

Check Price History
Ralco 0.850- 0.950 Range Light Liquid Density Hydrometer-picture-34
₹188
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 6 months ago

Ralco 0.850- 0.950 Range Light Liquid Density Hydrometer

Check Price History
SESW EG022 Manual Egg Incubator with 50 Pcs Egg Tray-picture-35
₹46019
industrybuying.com small logo
Industrybuying.com
Price Rise+1020
Price Up 7 months ago

SESW EG022 Manual Egg Incubator with 50 Pcs Egg Tray

Check Price History
BR Biochem 0-50 Oscillations/Min Dual Rocking Shaker, BRGRD-100-picture-36
₹47199
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem 0-50 Oscillations/Min Dual Rocking Shaker, BRGRD-100

Check Price History
Otica 24 Inch Polymer Formalin Chamber-picture-37
₹8731
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

Otica 24 Inch Polymer Formalin Chamber

Check Price History
LABTOP LTS-4 Blood Bag Tube Sealer-picture-38
₹103839
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

LABTOP LTS-4 Blood Bag Tube Sealer

Check Price History
Vinsyst VSV-25 Scott Volumeter 25 ml-picture-39
₹86139
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

Vinsyst VSV-25 Scott Volumeter 25 ml

Check Price History
Carson Intermediate 100x-1000x Biological Microscope, Mechanical Stage-picture-40
₹27139
industrybuying.com small logo
Industrybuying.com
Price Rise+140
Price Up 7 months ago

Carson Intermediate 100x-1000x Biological Microscope, Mechanical Stage

Check Price History
Neuation iIFUGE HCT NXT Hematocrit Centrifuge with Microprocessor and Brushless Motor-picture-42
₹61359
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

Neuation iIFUGE HCT NXT Hematocrit Centrifuge with Microprocessor and Brushless Motor

Check Price History
BR Biochem 35 L Capacity Liquid Nitrogen Container With Racks & Boxes, BR-35-125-picture-43
₹176999
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem 35 L Capacity Liquid Nitrogen Container With Racks & Boxes, BR-35-125

Check Price History
LABTOP LBR-200 Blood Bank Refrigerator-picture-44
₹235999
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

LABTOP LBR-200 Blood Bank Refrigerator

Check Price History
BR Biochem 340-1000 nm Wavelength Range Single Beam Spectrophotometer, BI-721-picture-45
₹46019
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem 340-1000 nm Wavelength Range Single Beam Spectrophotometer, BI-721

Check Price History
anjay engitech Anjay Travelling Microscope SU 061-picture-47
₹6253
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

anjay engitech Anjay Travelling Microscope SU 061

Check Price History
BR Biochem Huy, 10x, & 5x or 15x (Paired) Binocular Microscope, BR-CXI-picture-48
₹37759
industrybuying.com small logo
Industrybuying.com
No Recent Price Movement
Price Up 7 months ago

BR Biochem Huy, 10x, & 5x or 15x (Paired) Binocular Microscope, BR-CXI

Check Price History