Search CheapestInIndia.com

Borosil wbs 650w 4 flask position water bath, blfhwbs050

moglix.com small logoMoglix.comBrand : borosil
Borosil WBS 650W 4 Flask Position Water Bath, BLFHWBS050 image 1
₹65642
*

Moglix Price History - Borosil wbs 650 w 4 flask position
From: 9 Nov 2024 to 6 Nov 2025

moglix.com Borosil WBS 650W 4 Flask Position Water Bath, BLFHWBS050 borosil Price History Graph from 9 Nov 2024 to 6 Nov 2025

moglix.com Price History Table - Borosil WBS 650W 4 Flask Position ...

NoTimePriceChange
16 Nov 2025656420
210 Nov 202465642
-3516
39 Nov 202469158

Product Info

FeatureValue
StoreMoglix.com
Brand
Lowest Price Detected₹ 65642
Lowest Price Date6 nov 2025
Best Price Was Aboutjust now
Price History Available Since9 Nov 2024

CheapestInIndia Price Intelligence & Research Analysis Confidence : high

Fantastic! The current price of ₹65,642 is at its best ever level. Over the 362 day price history period, prices have ranged from ₹65,642 to ₹69,158, with an average of ₹67,048. The pricing has been quite stable with low volatility, and the overall trend is favorable for consumers as prices are getting cheaper. In terms of recent activity, there have been 0 price changes this week, 0 this month, and 3 over the past year. This is an excellent time to make a purchase as prices are trending downward and conditions appear favorable.

Our analysis has high confidence in this assessment based on stable price patterns. The next estimated price target is ₹65,290, trending lower, making this potentially a good time to wait for an even better deal.

Similar products from Moglix.com

Remi 4500rpm Neya-8 Centrifugation, NEYA-8-picture-13
₹77880
moglix.com small logo
Moglix.com
Price Drop-235
Price Down 1 year ago

Remi 4500rpm Neya-8 Centrifugation, NEYA-8

Check Price History
Borosil WBS 650W Water Bath, BLFHWBS05S-picture-17
₹75763
moglix.com small logo
Moglix.com
Price Drop-4058
Price Down 1 year ago

Borosil WBS 650W Water Bath, BLFHWBS05S

Check Price History
Borosil 4mm Vortex Mixer, 100MS00028000-picture-18
₹16627
moglix.com small logo
Moglix.com
Price Drop-891
Price Down 1 year ago

Borosil 4mm Vortex Mixer, 100MS00028000

Check Price History
Insize ISM-DM40 Digital Measuring Microscope-picture-23
₹50067
moglix.com small logo
Moglix.com
No Recent Price Movement

Insize ISM-DM40 Digital Measuring Microscope

Check Price History
Magnus Biological Research Microscope, CX21i-picture-27
₹62268
moglix.com small logo
Moglix.com
Price Drop-4748
Price Down 1 year ago

Magnus Biological Research Microscope, CX21i

Check Price History
RAC Operation Microscope, 5057-picture-31
₹104430
moglix.com small logo
Moglix.com
No Recent Price Movement

RAC Operation Microscope, 5057

Check Price History
SESW Digital Wired Thermometer Sensor, 0MF702-picture-35
₹417
moglix.com small logo
Moglix.com
No Recent Price Movement

SESW Digital Wired Thermometer Sensor, 0MF702

Check Price History
Borosil 18Kg Multi Tube Vortexer, 100VMMT6025000-picture-38
₹143718
moglix.com small logo
Moglix.com
Price Drop-7698
Price Down 1 year ago

Borosil 18Kg Multi Tube Vortexer, 100VMMT6025000

Check Price History